2014 Teague Drive Bridge

Teague Drive Bridge Replacement (Bridge Number 095/175)

General Info

Lead department: Engineering Department
Project manager: Robert Puff, Engineering Director
Funding: Tax Rate; Bond; State Aid Bridge Funding

Project Details

The Town of Salem completed reconstruction of Teague Drive Bridge over the Spicket River during the 2014 construction season. Prior to replacement the existing bridge was on the NH Department of Transportation (NHDOT) "red list". The bridge had previously been closed to traffic in 2013. The project consisted of full replacement of a twin metal pipe arch structure with a twin precast concrete box structure. The project also involved reconstruction of the adjacent roadway. The project is located on Teague Drive between the intersections of Parker Circle and Pawtucket Lane.